Source-backed places. Use Upcoming to explore what is being built or studied.
Beyond the pins
Projects and networks with no verified site or route
geometry in this catalogue.
ASPIRE 2B · national supercomputingOperational · NSCC Singapore
NSCC launched ASPIRE 2B on 8 June 2026. The launch venue is not used as evidence of the computer’s physical hosting location.
Launched 8 June 2026; hosting location not verified for a map pin.
Status evidence: 8 Jun 2026 ·
checked 10 Sept 2026Equinix SG6 · announced expansionAnnounced · Equinix
Equinix announced SG6 in November 2024. Its current expansion schedule lists Q1 2027; the exact site has not been verified here.
Operator schedule: Q1 2027; opening is not yet established by these sources.
Status evidence: 10 Sept 2026 ·
checked 10 Sept 2026Tuas Power · new 670 MW generation awardAnnounced · EMA / Tuas Power
EMA awarded Tuas Power new generation capacity in August 2026. The award is recorded separately from the operating Tuas Power Station.
Commercial operation required by December 2031.
Status evidence: 20 Aug 2026 ·
checked 10 Sept 2026PacificLight · new 670 MW plantAnnounced · PacificLight
PacificLight appointed its EPC consortium in October 2025 for a new Jurong Island plant with integrated battery storage. The exact project lot is not mapped here.
Target commercial operation: 2029; EPC appointment alone does not verify construction progress.
Status evidence: 23 Oct 2025 ·
checked 10 Sept 2026Seletar Line, Tengah Line and JRL West Coast studiesStudy · LTA
LTA planned engineering studies for initial phases in 2026. These are study-stage corridors, not confirmed operational lines or surveyed station sites.
Study programme; no opening year asserted.
Status evidence: 4 Mar 2026 ·
checked 10 Sept 2026AUG East · regional submarine cable initiativeAnnounced · Singtel / consortium
The consortium announced a submarine cable system across East Asia in July 2025. No exact landing point or underwater route is inferred on this map.
Announced initiative; delivery and landing-site details require further source verification.
Status evidence: 16 Jul 2025 ·
checked 10 Sept 2026DTSS Phase 2 · used-water networkConstruction · PUB
DTSS Phase 2 links a used-water network with the new Tuas Water Reclamation Plant. Completed tunnelling does not mean the whole treatment system is operational.
Phased commissioning from 2027.
Status evidence: 3 Mar 2026 ·
checked 10 Sept 2026Changi Water Reclamation PlantOperational · PUB
Changi Water Reclamation Plant is an operating part of the DTSS system. A reliable site coordinate is not yet included, so this record remains unpinned.
Existing treatment infrastructure; future expansion capacity is not current output.
Status evidence: 10 Sept 2026 ·
checked 10 Sept 2026