DC Tuas · Nxera
A 58 MW data centre opened in February 2026, with liquid cooling designed for high-density AI workloads.
Follow the facts, compare the plans and explore what is missing. No account needed.
The linked source supports the reported stage. Targets remain subject to change.
- Status evidence
- 9 Feb 2026
- Record checked
- 9 Sept 2026
Status & scale
Opened February 2026
58 MW — IT capacity. Singtel / JTC ↗
Why it matters
Editorial contextCompute growth depends on cooling and connectivity as well as floor space. The operator reports a direct connection to a cable landing station.
Questions to follow
Research prompts · not assertions of future events- How much announced IT capacity is occupied versus merely available?
- What operating evidence is published for cooling efficiency and electricity sourcing?
Location precision
7A Tuas Avenue 3 address reference; building footprint not independently verified.
Geographic reference ↗Evidence & sources
- DC Tuas opens ↗
Singtel / JTC · 9 Feb 2026 · accessed 9 Sept 2026 - DC Tuas design certificate (2024 address reference) ↗
TIA · 25 Sept 2024 · accessed 9 Sept 2026
Recorded history
- 9 Feb 2026 — DC Tuas officially opens. Source ↗
Wider context
Green Data Centre Roadmap
Sector-wide policy context; this does not assert that either project received a specific allocation.
Read the policy source ↗Edition reviewed 10 Sept 2026. Evidence dates do not imply a live site inspection. Campus and area references do not establish exact building footprints.