Keppel Merlimau Cogen
An operating 1,300 MW combined-cycle gas turbine power plant on Jurong Island.
Follow the facts, compare the plans and explore what is missing. No account needed.
The linked source supports the reported stage. Targets remain subject to change.
- Status evidence
- 9 Sept 2026
- Record checked
- 9 Sept 2026
Status & scale
Operating plant · distinct from Keppel Sakra
1,300 MW — Generation capacity. Keppel ↗
At a glance
Why it matters
Editorial contextMerlimau supplies the electricity system supporting industrial activity. Keppel’s separate 600 MW Sakra plant is another asset; the two should not be merged into one location.
Questions to follow
Research prompts · not assertions of future events- How do contractual capacity, plant availability and actual output differ?
- What changes follow integration of operations with the separate Sakra plant?
Location precision
Named power-station campus reference from OpenStreetMap; no internal equipment or connection layout is represented.
Geographic reference ↗Evidence & sources
- Keppel Merlimau Cogen capacity and investment ↗
Keppel · Publication date not stated · accessed 9 Sept 2026 - Sakra commercial operations and Merlimau operating integration ↗
Keppel · Publication date not stated · accessed 9 Sept 2026
Recorded history
No precisely dated milestone is recorded in this edition.
Wider context
SP transmission cable tunnel network
These places illustrate different roles in the electricity system. The links are educational context, not a verified network topology.
Read the policy source ↗Edition reviewed 10 Sept 2026. Evidence dates do not imply a live site inspection. Campus and area references do not establish exact building footprints.